The first Typhoon Tranche 3 Front Fuselage unit has rolled off the production line at our Samlesbury site.
Under the Tranche 3A contract signed in 2009, a total of 112 aircraft have been ordered for the four European partner nations, with 40 aircraft bound for the Royal Air Force. Deliveries of Tranche 3 aircraft are expected to start in 2013.
Building on the success of the Typhoons already proven in service, as demonstrated during Libyan Operations, Tranche 3 aircraft will be even more capable.
The Tranche 3 front fuselage, part of the British single seat aircraft number 116, includes over 350 modified parts designed, engineered and assembled ready to incorporate the most advanced capability enhancements.
Under the Tranche 3A contract signed in 2009, a total of 112 aircraft have been ordered for the four European partner nations, with 40 aircraft bound for the Royal Air Force. Deliveries of Tranche 3 aircraft are expected to start in 2013.
Building on the success of the Typhoons already proven in service, as demonstrated during Libyan Operations, Tranche 3 aircraft will be even more capable.
The Tranche 3 front fuselage, part of the British single seat aircraft number 116, includes over 350 modified parts designed, engineered and assembled ready to incorporate the most advanced capability enhancements.
