Thursday, February 28, 2013

FABA systems caries out the first tests of the software for the control of the Australian destroyers platform

Navantia FABA systems Control systems HAS Carried out the first official test of the software for the integrated platform of Control (IPMS, in English), Which will equip three ships AWD for Australia. The tests Were Performed in face-to-face together with the team of Inspectors from the shipyard That built the ships in Australia, ASC, as well as with the Royal Australian Navy (RAN). The second test of the software before installing on vessels be Held in December.

Tests Have Been Developed Throughout The month of February, beginning with meetings Beginning of tests (RRT) and ending with results analysis meetings. They Have taken place in the facilities of control systems in the shipyard of Navantia Cartagena, one year comprehensive test environment (LBTS), set each Stock In Which element of the IPMS is present, reflecting the final configuration of the boat.

The resulting and software will serve as reference to parallel simulation program for training of endowments (IPMS TS) for the three destroyers of the Hobart class, ACS shipyard is building at icts facilities in Adelaide.

No comments:

Post a Comment